
Homesite · West Bay Hills
Homesite 44 sits high on the West Bay Hills ridge, where the afternoon light runs the length of the coast and the view corridor down to the water is protected by the community plan — what you see on your first visit is what you keep.
The parcel is graded, with power, water and fibre at the lot line and the community road already paved. Build when you are ready: there is no construction deadline, and the RCL team can introduce vetted local architects and builders who know the hillside.
The view corridor is protected by the community plan — what you see is what you keep.
Availability at a glance
Compare position, orientation and availability before you fly. Every parcel state stays synchronised with the live records.
Building possibilities
The parcel supports a single residence of up to two storeys within the community design guidelines, positioned to keep the ocean corridor open. Most owners build 2,400–3,200 ft² over a garage or casita level set into the slope.
Grading is complete and geotechnical study is on file — foundations typically start within weeks of permit, and the community architectural review runs two to four weeks.
See it properly
A private call takes twenty minutes; an island visit takes a day or two, planned hour by hour by the RCL team — property walkthroughs through to dinner.